Full bill text
The complete text as filed. This is the legislature's own wording — not a summary.
I 119TH CONGRESS 2D SESSION H. R. 10988 To amend the Federal Power Act to direct the Federal Energy Regulatory Commission to require that public utilities use advanced transmission technologies when carrying out certain projects, and for other purposes. IN THE HOUSE OF REPRESENTATIVES NOVEMBER 10, 2026 Mr. V INDMAN introduced the following bill; which was referred to the Committee on Energy and Commerce A BILL To amend the Federal Power Act to direct the Federal Energy Regulatory Commission to require that public utilities use advanced transmission technologies when carrying out certain projects, and for other purposes. Be it enacted by the Senate and House of Representa-1 tives of the United States of America in Congress assembled,2 SECTION 1. SHORT TITLE.3 This Act may be cited as the ‘‘Lower Electricity Bills4 Act’’.5 VerDate Sep 11 2014 02:41 Nov 11, 2026 Jkt 079200 PO 00000 Frm 00001 Fmt 6652 Sfmt 6201 E:\BILLS\H10988.IH H10988 ssavage on LAPJG3WLY3PROD with BILLS 2 •HR 10988 IH SEC. 2. ADVANCED TRANSMISSION TECHNOLOGIES.1 (a) IN GENERAL .—Part II of the Federal Power Act2 (16 U.S.C. 824 et seq.) is amended by adding at the end3 the following:4 ‘‘SEC. 224. USE OF ADVANCED TRANSMISSION TECH-5 NOLOGIES.6 ‘‘(a) DEFINITIONS .—In this section:7 ‘‘(1) ADVANCED TRANSMISSION TECH -8 NOLOGY .—The term ‘advanced transmission tech-9 nology’ has the meaning given the term in section10 1223(a) of the Energy Policy Act of 2005 (4211 U.S.C. 16422(a)).12 ‘‘(2) BEST -AVAILABLE TRANSMISSION CON -13 DUCTOR .—The term ‘best-available transmission14 conductor’ means a transmission conductor that, as15 determined by the Commission—16 ‘‘(A) provides the greatest feasible and17 commercially available energy-carrying capacity18 at a given voltage level;19 ‘‘(B) provides the highest feasible and20 commercially available electrical efficiency at21 that voltage level; and22 ‘‘(C) provides the greatest available level of23 mechanical performance, including mitigating24 thermal sag at the maximum rated trans-25 VerDate Sep 11 2014 02:41 Nov 11, 2026 Jkt 079200 PO 00000 Frm 00002 Fmt 6652 Sfmt 6201 E:\BILLS\H10988.IH H10988 ssavage on LAPJG3WLY3PROD with BILLS 3 •HR 10988 IH mission-carrying capacity of the applicable1 transmission facility.2 ‘‘(3) COMMISSION .—The term ‘Commission’3 means the Federal Energy Regulatory Commission.4 ‘‘(4) C OVERED PROJECT .—The term ‘covered5 project’ means the construction of a new trans-6 mission facility, or the modification, upgrade, re-7 placement, or reconductoring of an existing trans-8 mission facility, subject to the jurisdiction of the9 Commission under section 201(b).10 ‘‘(b) USE OF ADVANCED TRANSMISSION TECH -11 NOLOGIES .—In exercising its authority under sections 20512 and 206, the Commission shall require that public utilities13 use advanced transmission technologies, including best-14 available transmission conductors, when carrying out cov-15 ered projects.16 ‘‘(c) PRESUMPTION OF PRUDENCE FOR ADVANCED17 TRANSMISSION TECHNOLOGIES .—In any filing seeking to18 recover the cost of an advanced transmission technology19 for a covered project, and in any proceeding to determine20 whether that cost may be recovered through rates, the21 Commission shall presume that—22 ‘‘(1) the use of an advanced transmission tech-23 nology is a prudent practice; and24 VerDate Sep 11 2014 02:41 Nov 11, 2026 Jkt 079200 PO 00000 Frm 00003 Fmt 6652 Sfmt 6201 E:\BILLS\H10988.IH H10988 ssavage on LAPJG3WLY3PROD with BILLS 4 •HR 10988 IH ‘‘(2) the costs associated with the use of an ad-1 vanced transmission technology are just and reason-2 able.3 ‘‘(d) APPLICABILITY .—The requirements of this sec-4 tion apply only to public utilities and only with respect5 to covered projects.6 ‘‘(e) RULEMAKING .—7 ‘‘(1) IN GENERAL .—Not later than 1 year after8 the date of enactment of this section, the Commis-9 sion shall issue an order or rule to implement this10 section.11 ‘‘(2) R EQUIREMENTS .—In issuing an order or12 rule under paragraph (1), the Commission shall—13 ‘‘(A) require that public utilities conduct,14 on Commission-established timelines, recurring15 evaluations—16 ‘‘(i) to determine whether the benefits17 associated with deploying advanced trans-18 mission technologies through 1 or more19 covered projects, including benefits to the20 current transmission system of the applica-21 ble public utility, outweigh the costs (such22 that the applicable benefit-cost ratio is23 greater than 1);24 VerDate Sep 11 2014 02:41 Nov 11, 2026 Jkt 079200 PO 00000 Frm 00004 Fmt 6652 Sfmt 6201 E:\BILLS\H10988.IH H10988 ssavage on LAPJG3WLY3PROD with BILLS 5 •HR 10988 IH ‘‘(ii) that include a least-cost analysis1 with respect to the transmission system of2 the applicable public utility; and3 ‘‘(iii) that evaluate whether the costs4 for which recovery is sought reflect due5 care to minimize the total cost of the appli-6 cable covered projects;7 ‘‘(B) require public utilities to conduct, on8 Commission-established timelines, recurring9 evaluations to consider planning and construc-10 tion timelines for new transmission assets and11 risks and impacts of potential delays;12 ‘‘(C) require that, if the benefits of 1 or13 more advanced transmission technologies out-14 weigh the costs (such that the applicable ben-15 efit-cost ratio is greater than 1), the applicable16 public utility shall deploy the advanced trans-17 mission technologies on a timeline determined18 by the Commission;19 ‘‘(D) require that decisions on whether to20 implement advanced transmission technologies21 based on the recurring evaluations under sub-22 paragraphs (A) and (B) are reported to the23 Commission, in a manner determined by the24 Commission;25 VerDate Sep 11 2014 02:41 Nov 11, 2026 Jkt 079200 PO 00000 Frm 00005 Fmt 6652 Sfmt 6201 E:\BILLS\H10988.IH H10988 ssavage on LAPJG3WLY3PROD with BILLS 6 •HR 10988 IH ‘‘(E) in consultation with the Secretary of1 Energy, establish a methodology for deter-2 mining whether a transmission conductor is a3 best-available transmission conductor for pur-4 poses of this section;5 ‘‘(F) ensure that the methodology estab-6 lished under subparagraph (E) is consistent7 with the criteria described in clauses (i)8 through (iii) of subparagraph (A);9 ‘‘(G) provide for periodic review and up-10 dating of the methodology established under11 subparagraph (E) not less frequently than an-12 nually to reflect improvements in technology,13 materials, and system performance; and14 ‘‘(H) determine a penalty for any public15 utility that fails to deploy the relevant advanced16 transmission technologies when the applicable17 benefit-cost ratio is greater than 1 in a time-18 frame determined by the Commission, including19 a reduction of the effective return on equity for20 the transmission system of the public utility.’’.21 (b) DEFINITION OF ADVANCED TRANSMISSION22 TECHNOLOGY .—Section 1223(a) of the Energy Policy Act23 of 2005 (42 U.S.C. 16422(a)) is amended—24 VerDate Sep 11 2014 02:41 Nov 11, 2026 Jkt 079200 PO 00000 Frm 00006 Fmt 6652 Sfmt 6201 E:\BILLS\H10988.IH H10988 ssavage on LAPJG3WLY3PROD with BILLS 7 •HR 10988 IH (1) in paragraph (18), by striking ‘‘and’’ at the1 end;2 (2) by redesignating paragraph (19) as para-3 graph (23); and4 (3) by inserting after paragraph (18) the fol-5 lowing:6 ‘‘(19) dynamic line rating;7 ‘‘(20) advanced power flow control;8 ‘‘(21) transmission topology optimization;9 ‘‘(22) high-performance conductors; and’’.10 Æ VerDate Sep 11 2014 02:41 Nov 11, 2026 Jkt 079200 PO 00000 Frm 00007 Fmt 6652 Sfmt 6301 E:\BILLS\H10988.IH H10988 ssavage on LAPJG3WLY3PROD with BILLS
Text is provided by LegiScan and may lag the latest filed version. Compare with the official version ↗