Full bill text
The complete text as filed. This is the legislature's own wording — not a summary.
I 119TH CONGRESS 2D SESSION H. R. 10989 To amend the Federal Power Act to provide that activities to maintain or increase the capacity of the electric grid within certain areas are a category of actions designated as being categorically excluded from the preparation of an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969, and for other purposes. IN THE HOUSE OF REPRESENTATIVES NOVEMBER 10, 2026 Mr. V INDMAN introduced the following bill; which was referred to the Committee on Energy and Commerce A BILL To amend the Federal Power Act to provide that activities to maintain or increase the capacity of the electric grid within certain areas are a category of actions designated as being categorically excluded from the preparation of an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969, and for other purposes. Be it enacted by the Senate and House of Representa-1 tives of the United States of America in Congress assembled,2 VerDate Sep 11 2014 00:02 Nov 12, 2026 Jkt 079200 PO 00000 Frm 00001 Fmt 6652 Sfmt 6201 E:\BILLS\H10989.IH H10989 kjohnson on DSK7ZCZBW3PROD with $$_JOB 2 •HR 10989 IH SECTION 1. SHORT TITLE.1 This Act may be cited as the ‘‘Smart Transmission2 Line Placement Act’’.3 SEC. 2. CATEGORICAL EXCLUSION FOR RECONDUCTORING.4 The Federal Power Act is amended by inserting after5 section 216 (16 U.S.C. 824p) the following:6 ‘‘SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING7 RIGHTS-OF-WAY.8 ‘‘(a) DEFINITIONS .—In this section:9 ‘‘(1) APPLICABLE ELECTRICAL STANDARD .—10 The term ‘applicable electrical standard’ includes—11 ‘‘(A) a reliability standard (as defined in12 section 215(a)); and13 ‘‘(B) an applicable standard of the Na-14 tional Electrical Safety Code published by the15 Institute of Electrical and Electronics Engi-16 neers Standards Association.17 ‘‘(2) C OVERED AREA .—The term ‘covered area’18 means an area—19 ‘‘(A) within an existing right-of-way; or20 ‘‘(B) within the minimum additional area21 adjacent to an existing right-of-way that is nec-22 essary—23 ‘‘(i) to comply with applicable elec-24 trical standards; or25 VerDate Sep 11 2014 00:02 Nov 12, 2026 Jkt 079200 PO 00000 Frm 00002 Fmt 6652 Sfmt 6201 E:\BILLS\H10989.IH H10989 kjohnson on DSK7ZCZBW3PROD with $$_JOB 3 •HR 10989 IH ‘‘(ii) to complete an activity described1 in subsection (b).2 ‘‘(3) COVERED FACILITY .—The term ‘covered3 facility’ means an existing electric transmission or4 distribution facility or associated infrastructure (in-5 cluding an electrical substation) that is located with-6 in a covered area.7 ‘‘(b) EXEMPTIONS .—8 ‘‘(1) IN GENERAL .—Activities to maintain or9 increase the capacity of the electric grid within a10 covered area, and any Federal agency action author-11 izing such activities—12 ‘‘(A) are a category of actions designated13 as being categorically excluded from the prepa-14 ration of an environmental assessment or an15 environmental impact statement under the Na-16 tional Environmental Policy Act of 1969 (4217 U.S.C. 4321 et seq.); and18 ‘‘(B) shall not be considered to be—19 ‘‘(i) a major Federal action for pur-20 poses of that Act; or21 ‘‘(ii) an undertaking for purposes of22 section 306108 of title 54, United States23 Code.24 VerDate Sep 11 2014 00:02 Nov 12, 2026 Jkt 079200 PO 00000 Frm 00003 Fmt 6652 Sfmt 6201 E:\BILLS\H10989.IH H10989 kjohnson on DSK7ZCZBW3PROD with $$_JOB 4 •HR 10989 IH ‘‘(2) INCLUSIONS .—The activities described in1 paragraph (1) include—2 ‘‘(A) any repair, maintenance, replace-3 ment, upgrade, rebuilding, modification, optimi-4 zation, minor relocation of, or addition to, a5 covered facility, including—6 ‘‘(i) reconductoring;7 ‘‘(ii) an increase in operating voltage;8 ‘‘(iii) a circuit addition or adjustment;9 and10 ‘‘(iv) installation of advanced trans-11 mission technologies (as defined in section12 1223(a) of the Energy Policy Act of 200513 (42 U.S.C. 16422(a)));14 ‘‘(B) any minimum widening of an existing15 right-of-way associated with an activity de-16 scribed in subparagraph (A) that—17 ‘‘(i) is necessary to comply with appli-18 cable electrical standards; or19 ‘‘(ii) remains within a covered area;20 ‘‘(C) an addition of energy storage at or21 near a covered facility; and22 ‘‘(D) the addition of a parallel circuit with-23 in an existing right-of-way.’’.24 VerDate Sep 11 2014 00:02 Nov 12, 2026 Jkt 079200 PO 00000 Frm 00004 Fmt 6652 Sfmt 6201 E:\BILLS\H10989.IH H10989 kjohnson on DSK7ZCZBW3PROD with $$_JOB 5 •HR 10989 IH SEC. 3. ELECTRIC GRID PROJECTS.1 (a) DEFINITION OF PREVIOUSLY DISTURBED OR DE -2 VELOPED .—In this section, the term ‘‘previously disturbed3 or developed’’ has the meaning given the term in section4 1021.410(g)(1) of title 10, Code of Federal Regulations5 (or successor regulations).6 (b) RULEMAKING .—Not later than 180 days after the7 date of enactment of this Act, to facilitate timely permit-8 ting, the Secretary of the Interior and the Secretary of9 Agriculture shall each develop or adopt 1 or more categor-10 ical exclusions, including allowing for extraordinary cir-11 cumstances under which the categorical exclusion shall not12 be available, under the National Environmental Policy Act13 of 1969 (42 U.S.C. 4321 et seq.) for the following activi-14 ties:15 (1) Placement of an electric transmission or16 distribution facility in an approved right-of-way cor-17 ridor, including a corridor designated under section18 368 of the Energy Policy Act of 2005 (42 U.S.C.19 15926).20 (2) Any repair, maintenance, replacement, up-21 grade, modification, optimization, or minor reloca-22 tion of, or addition to, an existing electric trans-23 mission or distribution facility or associated infra-24 structure, including electrical substations, within an25 existing right-of-way or on otherwise previously dis-26 VerDate Sep 11 2014 00:02 Nov 12, 2026 Jkt 079200 PO 00000 Frm 00005 Fmt 6652 Sfmt 6201 E:\BILLS\H10989.IH H10989 kjohnson on DSK7ZCZBW3PROD with $$_JOB 6 •HR 10989 IH turbed or developed land, including reconductoring1 and installation of grid-enhancing technologies.2 (3) Construction, operation, upgrade, or decom-3 missioning of a battery or other energy storage tech-4 nology on previously disturbed or developed land.5 Æ VerDate Sep 11 2014 00:02 Nov 12, 2026 Jkt 079200 PO 00000 Frm 00006 Fmt 6652 Sfmt 6301 E:\BILLS\H10989.IH H10989 kjohnson on DSK7ZCZBW3PROD with $$_JOB
Text is provided by LegiScan and may lag the latest filed version. Compare with the official version ↗