This Illinois bill amends the Counties Code to expand local government authority to restrict or deny commercial wind, solar energy facilities, and energy storage systems. It allows counties to impose stricter setbacks if they impair development or harm property values and permits denial based on impacts to water treatment facilities, metropolitan areas, housing opportunities, agricultural land, or roadway capacity.
104TH GENERAL ASSEMBLY
 State of Illinois
 2025 and 2026 HB5837 Introduced , by Rep. Amy Elik SYNOPSIS AS INTRODUCED: 55 ILCS 5/5-12020 55 ILCS 5/5-12024 Amends the Counties Code. Provides that a county may require setback distances for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system in excess of those established under the Act upon a finding by the county board that the setback distances would impair residential, commercial, agricultural, or industrial development or negatively affect residential, commercial, agricultural, or industrial property values. Provides that a county may deny the siting approval, issuance of a special use permit, or modification of an approved siting or special use permit for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system if the county board finds that: (1) the energy facility or energy system will be located adjacent to a water treatment facility; (2) the energy facility or energy system will be located in a Metropolitan Statistical Area as delineated by the U.S. Office of Management and Budget; (3) the energy facility or energy system will limit housing opportunities in the county; (4) the energy facility or energy system will damage existing agricultural areas; or (5) any roadway will be unable to handle the traffic created by the energy facility or the energy system. LRB104 23685 TRT 40200 b A BILL FOR HB5837 LRB104 23685 TRT 40200 b 1 AN ACT concerning local government. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 Section 5. The Counties Code is amended by changing 5 Sections 5-12020 and 5-12024 as follows: 6 (55 ILCS 5/5-12020) 7 Sec. 5-12020. Commercial wind energy facilities and 8 commercial solar energy facilities. 9 (a) As used in this Section: 10 "Commercial solar energy facility" means a "commercial 11 solar energy system" as defined in Section 10-720 of the 12 Property Tax Code. "Commercial solar energy facility" does not 13 mean a utility-scale solar energy facility being constructed 14 at a site that was eligible to participate in a procurement 15 event conducted by the Illinois Power Agency pursuant to 16 subsection (c-5) of Section 1-75 of the Illinois Power Agency 17 Act. 18 "Commercial wind energy facility" means a wind energy 19 conversion facility of equal or greater than 500 kilowatts in 20 total nameplate generating capacity. "Commercial wind energy 21 facility" includes a wind energy conversion facility seeking 22 an extension of a permit to construct granted by a county or 23 municipality before January 27, 2023 (the effective date of HB5837 - 2 - LRB104 23685 TRT 40200 b 1 Public Act 102-1123). 2 "Facility owner" means (i) a person with a direct 3 ownership interest in a commercial wind energy facility or a 4 commercial solar energy facility, or both, regardless of 5 whether the person is involved in acquiring the necessary 6 rights, permits, and approvals or otherwise planning for the 7 construction and operation of the facility, and (ii) at the 8 time the facility is being developed, a person who is acting as 9 a developer of the facility by acquiring the necessary rights, 10 permits, and approvals or by planning for the construction and 11 operation of the facility, regardless of whether the person 12 will own or operate the facility. 13 "Nonparticipating property" means real property that is 14 not a participating property. 15 "Nonparticipating residence" means a residence that is 16 located on nonparticipating property and that is existing and 17 occupied on the date that an application for a permit to 18 develop the commercial wind energy facility or the commercial 19 solar energy facility is filed with the county. 20 "Occupied community building" means any one or more of the 21 following buildings that is existing and occupied on the date 22 that the application for a permit to develop the commercial 23 wind energy facility or the commercial solar energy facility 24 is filed with the county: a school, place of worship, early 25 care and education facility, public library, or community 26 center. HB5837 - 3 - LRB104 23685 TRT 40200 b 1 "Participating property" means real property that is the 2 subject of a written agreement between a facility owner and 3 the owner of the real property that provides the facility 4 owner an easement, option, lease, or license to use the real 5 property for the purpose of constructing a commercial wind 6 energy facility, a commercial solar energy facility, or 7 supporting facilities. "Participating property" also includes 8 real property that is owned by a facility owner for the purpose 9 of constructing a commercial wind energy facility, a 10 commercial solar energy facility, or supporting facilities. 11 "Participating residence" means a residence that is 12 located on participating property and that is existing and 13 occupied on the date that an application for a permit to 14 develop the commercial wind energy facility or the commercial 15 solar energy facility is filed with the county. 16 "Protected lands" means real property that is: 17 (1) subject to a permanent conservation right 18 consistent with the Real Property Conservation Rights Act; 19 or 20 (2) registered or designated as a nature preserve, 21 buffer, or land and water reserve under the Illinois 22 Natural Areas Preservation Act. 23 "Supporting facilities" means the transmission lines, 24 substations, access roads, meteorological towers, storage 25 containers, and equipment associated with the generation and 26 storage of electricity by the commercial wind energy facility HB5837 - 4 - LRB104 23685 TRT 40200 b 1 or commercial solar energy facility. "Supporting facilities" 2 includes energy storage systems capable of absorbing energy 3 and storing it for use at a later time, including, but not 4 limited to, batteries and other electrochemical and 5 electromechanical technologies or systems. 6 "Wind tower" includes the wind turbine tower, nacelle, and 7 blades. 8 (b) Notwithstanding any other provision of law or whether 9 the county has formed a zoning commission and adopted formal 10 zoning under Section 5-12007, a county may establish standards 11 for commercial wind energy facilities, commercial solar energy 12 facilities, or both. The standards may include all of the 13 requirements specified in this Section but may not include 14 requirements for commercial wind energy facilities or 15 commercial solar energy facilities that are more restrictive 16 than specified in this Section. A county may also regulate the 17 siting of commercial wind energy facilities with standards 18 that are not more restrictive than the requirements specified 19 in this Section in unincorporated areas of the county that are 20 outside the zoning jurisdiction of a municipality and that are 21 outside the 1.5-mile radius surrounding the zoning 22 jurisdiction of a municipality. A county may also regulate the 23 siting of commercial solar energy facilities with standards 24 that are not more restrictive than the requirements specified 25 in this Section in unincorporated areas of the county that are 26 outside of the zoning jurisdiction of a municipality. HB5837 - 5 - LRB104 23685 TRT 40200 b 1 (c) If a county has elected to establish standards under 2 subsection (b), before the county grants siting approval or a 3 special use permit for a commercial wind energy facility or a 4 commercial solar energy facility, or modification of an 5 approved siting or special use permit, the county board of the 6 county in which the facility is to be sited or the zoning board 7 of appeals for the county shall hold at least one public 8 hearing. The public hearing shall be conducted in accordance 9 with the Open Meetings Act and shall conclude not more than 60 10 days after the filing of the application for the facility. The 11 county shall allow interested parties to a special use permit 12 an opportunity to present evidence and to cross-examine 13 witnesses at the hearing, but the county may impose reasonable 14 restrictions on the public hearing, including reasonable time 15 limitations on the presentation of evidence and the 16 cross-examination of witnesses. The county shall also allow 17 public comment at the public hearing in accordance with the 18 Open Meetings Act. The county shall make its siting and 19 permitting decisions not more than 30 days after the 20 conclusion of the public hearing. Notice of the hearing shall 21 be published in a newspaper of general circulation in the 22 county. A facility owner must enter into an agricultural 23 impact mitigation agreement with the Department of Agriculture 24 prior to the date of the required public hearing. A commercial 25 wind energy facility owner seeking an extension of a permit 26 granted by a county prior to July 24, 2015 (the effective date HB5837 - 6 - LRB104 23685 TRT 40200 b 1 of Public Act 99-132) must enter into an agricultural impact 2 mitigation agreement with the Department of Agriculture prior 3 to a decision by the county to grant the permit extension. 4 Counties may allow test wind towers or test solar energy 5 systems to be sited without formal approval by the county 6 board. 7 (d) A county with an existing zoning ordinance in conflict 8 with this Section shall amend that zoning ordinance to be in 9 compliance with this Section within 120 days after January 27, 10 2023 (the effective date of Public Act 102-1123). 11 (e) A county may require: 12 (1) a wind tower of a commercial wind energy facility 13 to be sited as follows, with setback distances measured 14 from the center of the base of the wind tower: 15 Setback Description Setback Distance 16 Occupied Community 2.1 times the maximum blade tip 17 Buildings height of the wind tower to the 18 nearest point on the outside 19 wall of the structure 20 Participating Residences 1.1 times the maximum blade tip 21 height of the wind tower to the 22 nearest point on the outside 23 wall of the structure HB5837 - 7 - LRB104 23685 TRT 40200 b 1 Nonparticipating Residences 2.1 times the maximum blade tip 2 height of the wind tower to the 3 nearest point on the outside 4 wall of the structure 5 Boundary Lines of None 6 Participating Property 7 Boundary Lines of 1.1 times the maximum blade tip 8 Nonparticipating Property height of the wind tower to the 9 nearest point on the property 10 line of the nonparticipating 11 property 12 Public Road Rights-of-Way 1.1 times the maximum blade tip 13 height of the wind tower 14 to the center point of the 15 public road right-of-way 16 Overhead Communication and 1.1 times the maximum blade tip 17 Electric Transmission height of the wind tower to the 18 and Distribution Facilities nearest edge of the property 19 (Not Including Overhead line, easement, or 20 Utility Service Lines to right-of-way 21 Individual Houses or containing the overhead line HB5837 - 8 - LRB104 23685 TRT 40200 b 1 Outbuildings) 2 Overhead Utility Service None 3 Lines to Individual 4 Houses or Outbuildings 5 Fish and Wildlife Areas 2.1 times the maximum blade 6 and Illinois Nature tip height of the wind tower 7 Preserve Commission to the nearest point on the 8 Protected Lands property line of the fish and 9 wildlife area or protected 10 land 11 This Section does not exempt or excuse compliance with 12 electric facility clearances approved or required by the 13 National Electrical Code, the National Electrical Safety 14 Code, the Illinois Commerce Commission, and the Federal 15 Energy Regulatory Commission and their designees or 16 successors; 17 (2) a wind tower of a commercial wind energy facility 18 to be sited so that industry standard computer modeling 19 indicates that any occupied community building or 20 nonparticipating residence will not experience more than 21 30 hours per year of shadow flicker under planned 22 operating conditions; 23 (3) a commercial solar energy facility to be sited as 24 follows, with setback distances measured from the nearest HB5837 - 9 - LRB104 23685 TRT 40200 b 1 edge of any above-ground component of the facility, 2 excluding fencing: 3 Setback Description Setback Distance 4 Occupied Community 150 feet from the nearest 5 Buildings and Dwellings on point on the outside wall 6 Nonparticipating Properties of the structure 7 Boundary Lines of None 8 Participating Property 9 Public Road Rights-of-Way 50 feet from the nearest 10 edge of the public 11 right-of-way 12 Boundary Lines of 50 feet to the nearest 13 Nonparticipating Property point on the property 14 line of the nonparticipating 15 property 16 (4) a commercial solar energy facility to be sited so 17 that the facility's perimeter is enclosed by fencing 18 having a height of at least 6 feet and no more than 25 19 feet; and 20 (5) a commercial solar energy facility to be sited so HB5837 - 10 - LRB104 23685 TRT 40200 b 1 that no component of a solar panel has a height of more 2 than 20 feet above ground when the solar energy facility's 3 arrays are at full tilt. 4 This subsection (e) shall not preclude the ability of a 5 county to require a reasonable setback distance between 6 fencing and public rights-of-way if the requirement is not 7 specific to commercial wind energy facilities or commercial 8 solar energy facilities and does not preclude the development 9 of commercial wind energy facilities or commercial solar 10 energy facilities or the ability of commercial wind energy 11 facilities or commercial solar energy facilities to comply 12 with the requirements set forth in this subsection (e). 13 The requirements set forth in this subsection (e) may be 14 waived subject to the written consent of the owner of each 15 affected nonparticipating property. 16 (e-5) A county may require setback distances in excess of 17 those established under subsection (e) of this Section upon a 18 finding by the county board that the setback distances will 19 impair residential, commercial, agricultural, or industrial 20 development or negatively affect residential, commercial, 21 agricultural, or industrial property values. 22 (f) A county may not set a sound limitation for wind towers 23 in commercial wind energy facilities or any components in 24 commercial solar energy facilities that is more restrictive 25 than the sound limitations established by the Illinois 26 Pollution Control Board under 35 Ill. Adm. Code Parts 900, HB5837 - 11 - LRB104 23685 TRT 40200 b 1 901, and 910. Additionally, in accordance with Section 25 of 2 the Environmental Protection Act, a participating property, 3 participating residence, nonparticipating property, 4 nonparticipating residence, or any combination of those 5 properties or residences may waive enforcement of the rules 6 adopted by the Illinois Pollution Control Board under 35 Ill. 7 Adm. Code Parts 900, 901, and 910 by written waiver that 8 complies with the applicable directive established in Section 9 25 of the Environmental Protection Act and is recorded in the 10 Office of the Recorder of the county in which the 11 participating property, participating residence, 12 nonparticipating property, or nonparticipating residence is 13 located. Once recorded, such a waiver shall be binding on any 14 current and future owners, residents, lessees, invitees, and 15 users of the participating property, participating residence, 16 nonparticipating property, or nonparticipating residence for 17 enforcement purposes. An owner of any participating residence 18 or nonparticipating residence shall disclose the existence of 19 such a waiver to any lessee before entering any new lease for 20 the residence. 21 A seller or transferor of a participating property, 22 participating residence, nonparticipating property, 23 nonparticipating residence, or any combination of those 24 properties or residences shall disclose the existence of such 25 a waiver to any buyer or transferee before any sale or transfer 26 of the property. If disclosure of the waiver occurs after the HB5837 - 12 - LRB104 23685 TRT 40200 b 1 buyer has made an offer to purchase the property, the seller 2 shall disclose the existence of the waiver before accepting 3 the buyer's offer and shall (1) allow the buyer an opportunity 4 to review the disclosure and (2) inform the buyer that the 5 buyer has the right to amend the buyer's offer. 6 (g) A county may not place any restriction on the 7 installation or use of a commercial wind energy facility or a 8 commercial solar energy facility unless it adopts an ordinance 9 that complies with this Section. A county may not establish 10 siting standards for supporting facilities that preclude 11 development of commercial wind energy facilities or commercial 12 solar energy facilities. 13 A request for siting approval or a special use permit for a 14 commercial wind energy facility or a commercial solar energy 15 facility, or modification of an approved siting or special use 16 permit, shall be approved if the request is in compliance with 17 the standards and conditions imposed in this Act, the zoning 18 ordinance adopted consistent with this Act, and the conditions 19 imposed under State and federal statutes and regulations. 20 (h) (Blank). A county may not adopt zoning regulations 21 that disallow, permanently or temporarily, commercial wind 22 energy facilities or commercial solar energy facilities from 23 being developed or operated in any district zoned to allow 24 agricultural or industrial uses. 25 (i) (Blank). 26 (i-5) All siting approval or special use permit HB5837 - 13 - LRB104 23685 TRT 40200 b 1 application fees for a commercial wind energy facility or 2 commercial solar energy facility must be reasonable. Fees that 3 do not exceed $5,000 per each megawatt of nameplate capacity 4 of the energy facility, up to a maximum of $125,000, shall be 5 considered presumptively reasonable. A county may also require 6 reimbursement from the applicant for any reasonable expenses 7 incurred by the county in processing the siting approval or 8 special use permit application in excess of the maximum fee. A 9 siting approval or special use permit shall not be subject to 10 any time deadline to start construction or obtain a building 11 permit of less than 5 years from the date of siting approval or 12 special use permit approval. A county shall allow an applicant 13 to request an extension of the deadline based upon reasonable 14 cause for the extension request. The exemption shall not be 15 unreasonably withheld, conditioned, or denied. 16 (i-10) A county may require, for a commercial wind energy 17 facility or commercial solar energy facility, a single 18 building permit and a reasonable permit fee for the facility 19 which includes all supporting facilities. County building 20 permit fees for commercial wind energy facility or commercial 21 solar energy facility that do not exceed $5,000 per each 22 megawatt of nameplate capacity of the energy facility, up to a 23 maximum of $75,000, shall be considered presumptively 24 reasonable. A county may also require reimbursement from the 25 applicant for any reasonable expenses incurred by the county 26 in processing the building permit in excess of the maximum HB5837 - 14 - LRB104 23685 TRT 40200 b 1 fee. A county may require an applicant, upon start of 2 construction of the facility, to maintain liability insurance 3 that is commercially reasonable and consistent with prevailing 4 industry standards for similar energy facilities. 5 (i-15) A county may deny the siting approval, issuance of 6 a special use permit, or modification of an approved siting or 7 special use permit for a commercial wind energy facility or 8 commercial solar energy facility if the county board finds 9 that: 10 (1) the facility will be located adjacent to a water 11 treatment facility; 12 (2) the facility will be located in a Metropolitan 13 Statistical Area as delineated by the U.S. Office of 14 Management and Budget; 15 (3) the facility will limit housing opportunities in 16 the county; 17 (4) the facility will damage existing agricultural 18 areas; or 19 (5) any roadway will be unable to handle the traffic 20 created by the facility. 21 (j) Except as otherwise provided in this Section, a county 22 shall not require standards for construction, decommissioning, 23 or deconstruction of a commercial wind energy facility or 24 commercial solar energy facility or related financial 25 assurances that are more restrictive than those included in 26 the Department of Agriculture's standard wind farm HB5837 - 15 - LRB104 23685 TRT 40200 b 1 agricultural impact mitigation agreement, template 81818, or 2 standard solar agricultural impact mitigation agreement, 3 version 8.19.19, as applicable and in effect on December 31, 4 2022. The amount of any decommissioning payment shall be in 5 accordance with the financial assurance required by those 6 agricultural impact mitigation agreements. 7 (j-5) A commercial wind energy facility or a commercial 8 solar energy facility shall file a farmland drainage plan with 9 the county and impacted drainage districts outlining how 10 surface and subsurface drainage of farmland will be restored 11 during and following construction or deconstruction of the 12 facility. The plan is to be created independently by the 13 facility developer and shall include the location of any 14 potentially impacted drainage district facilities to the 15 extent this information is publicly available from the county 16 or the drainage district, plans to repair any subsurface 17 drainage affected during construction or deconstruction using 18 procedures outlined in the agricultural impact mitigation 19 agreement entered into by the commercial wind energy facility 20 owner or commercial solar energy facility owner, and 21 procedures for the repair and restoration of surface drainage 22 affected during construction or deconstruction. All surface 23 and subsurface damage shall be repaired as soon as reasonably 24 practicable. 25 (k) A county may not condition approval of a commercial 26 wind energy facility or commercial solar energy facility on a HB5837 - 16 - LRB104 23685 TRT 40200 b 1 property value guarantee and may not require a facility owner 2 to pay into a neighboring property devaluation escrow account. 3 (l) A county may require certain vegetative screening 4 between a commercial solar energy facility and 5 nonparticipating residences. A county may not require earthen 6 berms or similar structures. Vegetative screening requirements 7 shall be commercially reasonable and limited in height at full 8 maturity to avoid reduction of the productive energy output of 9 the commercial solar energy facility. A county may not require 10 vegetative screening to exceed 5 feet in height when first 11 installed or prior to commercial operation date. The screening 12 requirements shall take into account the size and location of 13 the facility, visibility from nonparticipating residences, 14 compatibility of native plant species, cost and feasibility of 15 installation and maintenance, and industry standards and best 16 practices for commercial solar energy facilities. 17 (m) A county may set blade tip height limitations for wind 18 towers in commercial wind energy facilities but may not set a 19 blade tip height limitation that is more restrictive than the 20 height allowed under a Determination of No Hazard to Air 21 Navigation by the Federal Aviation Administration under 14 CFR 22 Part 77. 23 (n) A county may require that a commercial wind energy 24 facility owner or commercial solar energy facility owner 25 provide: 26 (1) the results and recommendations from consultation HB5837 - 17 - LRB104 23685 TRT 40200 b 1 with the Illinois Department of Natural Resources that are 2 obtained through the Ecological Compliance Assessment Tool 3 (EcoCAT) or a comparable successor tool; and 4 (2) (blank). 5 (o) A county may require a commercial wind energy facility 6 or commercial solar energy facility to adhere to the 7 recommendations provided by the Illinois Department of Natural 8 Resources in an EcoCAT natural resource review report under 17 9 Ill. Adm. Code Part 1075. 10 (p) A county may require a facility owner to: 11 (1) demonstrate avoidance of protected lands as 12 identified by the Illinois Department of Natural Resources 13 and the Illinois Nature Preserve Commission; or 14 (2) consider the recommendations of the Illinois 15 Department of Natural Resources for setbacks from 16 protected lands, including areas identified by the 17 Illinois Nature Preserve Commission. 18 (q) A county may require that a facility owner provide 19 evidence of consultation with the Illinois State Historic 20 Preservation Office to assess potential impacts on 21 State-registered historic sites under the Illinois State 22 Agency Historic Resources Preservation Act. 23 (r) To maximize community benefits, including, but not 24 limited to, reduced stormwater runoff, flooding, and erosion 25 at the ground mounted solar energy system, improved soil 26 health, and increased foraging habitat for game birds, HB5837 - 18 - LRB104 23685 TRT 40200 b 1 songbirds, and pollinators, a county may (1) require a 2 commercial solar energy facility owner to plant, establish, 3 and maintain for the life of the facility vegetative ground 4 cover, consistent with the goals of the Pollinator-Friendly 5 Solar Site Act and (2) require the submittal of a vegetation 6 management plan that is in compliance with the agricultural 7 impact mitigation agreement in the application to construct 8 and operate a commercial solar energy facility in the county 9 if the vegetative ground cover and vegetation management plan 10 comply with the requirements of the underlying agreement with 11 the landowner or landowners where the facility will be 12 constructed. 13 No later than 90 days after January 27, 2023 (the 14 effective date of Public Act 102-1123), the Illinois 15 Department of Natural Resources shall develop guidelines for 16 vegetation management plans that may be required under this 17 subsection for commercial solar energy facilities. The 18 guidelines must include guidance for short-term and long-term 19 property management practices that provide and maintain native 20 and non-invasive naturalized perennial vegetation to protect 21 the health and well-being of pollinators. 22 (s) If a facility owner enters into a road use agreement 23 with the Illinois Department of Transportation, a road 24 district, or other unit of local government relating to a 25 commercial wind energy facility or a commercial solar energy 26 facility, the road use agreement shall require the facility HB5837 - 19 - LRB104 23685 TRT 40200 b 1 owner to be responsible for (i) the reasonable cost of 2 improving roads used by the facility owner to construct the 3 commercial wind energy facility or the commercial solar energy 4 facility and (ii) the reasonable cost of repairing roads used 5 by the facility owner during construction of the commercial 6 wind energy facility or the commercial solar energy facility 7 so that those roads are in a condition that is safe for the 8 driving public after the completion of the facility's 9 construction. Roadways improved in preparation for and during 10 the construction of the commercial wind energy facility or 11 commercial solar energy facility shall be repaired and 12 restored to the improved condition at the reasonable cost of 13 the developer if the roadways have degraded or were damaged as 14 a result of construction-related activities. 15 The road use agreement shall not require the facility 16 owner to pay costs, fees, or charges for road work that is not 17 specifically and uniquely attributable to the construction of 18 the commercial wind energy facility or the commercial solar 19 energy facility. No road district or other unit of local 20 government may request or require permit fees, fines, or other 21 payment obligations as a requirement for a road use agreement 22 with a facility owner unless the amount of the reasonable 23 permit fee or payment is equivalent to the amount of actual 24 expenses incurred by the road district or other unit of local 25 government for negotiating, executing, constructing, or 26 implementing the road use agreement. The road use agreement HB5837 - 20 - LRB104 23685 TRT 40200 b 1 shall not require any road work to be performed by or paid for 2 by the facility owner that is not specifically and uniquely 3 attributable to the road improvements required for the 4 construction of the commercial wind energy facility or the 5 commercial solar energy facility or the restoration of the 6 roads used by the facility owner during construction-related 7 activities. 8 (s-5) The facility owner shall also compensate landowners 9 for crop losses or other agricultural damages resulting from 10 damage to the drainage system caused by the construction of 11 the commercial wind energy facility or the commercial solar 12 energy facility. The commercial wind energy facility owner or 13 commercial solar energy facility owner shall repair or pay for 14 the repair of all damage to the subsurface drainage system 15 caused by the construction of the commercial wind energy 16 facility or the commercial solar energy facility in accordance 17 with the agriculture impact mitigation agreement requirements 18 for repair of drainage. The commercial wind energy facility 19 owner or commercial solar energy facility owner shall repair 20 or pay for the repair and restoration of surface drainage 21 caused by the construction or deconstruction of the commercial 22 wind energy facility or the commercial solar energy facility 23 as soon as reasonably practicable. 24 (t) Notwithstanding any other provision of law, a facility 25 owner with siting approval from a county to construct a 26 commercial wind energy facility or a commercial solar energy HB5837 - 21 - LRB104 23685 TRT 40200 b 1 facility is authorized to cross or impact a drainage system, 2 including, but not limited to, drainage tiles, open drainage 3 ditches, culverts, and water gathering vaults, owned or under 4 the control of a drainage district under the Illinois Drainage 5 Code without obtaining prior agreement or approval from the 6 drainage district in accordance with the farmland drainage 7 plan required by subsection (j-5). 8 (u) The amendments to this Section adopted in Public Act 9 102-1123 do not apply to: (1) an application for siting 10 approval or for a special use permit for a commercial wind 11 energy facility or commercial solar energy facility if the 12 application was submitted to a unit of local government before 13 January 27, 2023 (the effective date of Public Act 102-1123); 14 (2) a commercial wind energy facility or a commercial solar 15 energy facility if the facility owner has submitted an 16 agricultural impact mitigation agreement to the Department of 17 Agriculture before January 27, 2023 (the effective date of 18 Public Act 102-1123); (3) a commercial wind energy or 19 commercial solar energy development on property that is 20 located within an enterprise zone certified under the Illinois 21 Enterprise Zone Act, that was classified as industrial by the 22 appropriate zoning authority on or before January 27, 2023, 23 and that is located within 4 miles of the intersection of 24 Interstate 88 and Interstate 39; or (4) a commercial wind 25 energy or commercial solar energy development on property in 26 Madison County that is located within the area that has as its HB5837 - 22 - LRB104 23685 TRT 40200 b 1 northern boundary the portion of Drexelius Road that is 2 between the intersection of Drexelius Road and Wolf Road and 3 the intersection of Drexelius Road and Fosterburg Road, that 4 has as its eastern boundary the portion of Fosterburg Road 5 that is between the intersection of Fosterburg Road and 6 Drexelius Road and the intersection of Fosterburg Road and 7 Wolf Road, and that has as its southern and western boundaries 8 the portion of Wolf Road that is between the intersection of 9 Fosterburg Road and Wolf Road and the intersection of 10 Drexelius Road and Wolf Road. 11 (Source: P.A. 103-81, eff. 6-9-23; 103-580, eff. 12-8-23; 12 104-417, eff. 8-15-25; 104-458, eff. 6-1-26; 104-480, eff. 13 7-1-26.) 14 (55 ILCS 5/5-12024) 15 Sec. 5-12024. Energy storage systems. 16 (a) As used in this Section: 17 "Energy storage system" means a facility with an aggregate 18 energy capacity that is greater than 1,000 kilowatts and that 19 is capable of absorbing energy and storing it for use at a 20 later time, including, but not limited to, electrochemical and 21 electromechanical technologies. "Energy storage system" does 22 not include technologies that require combustion. "Energy 23 storage system" also does not include energy storage systems 24 associated with commercial solar energy facilities or 25 commercial wind energy facilities as defined in Section HB5837 - 23 - LRB104 23685 TRT 40200 b 1 5-12020. 2 "Excused service interruption" means any period during 3 which an energy storage system does not store or discharge 4 electricity and that is planned or reasonably foreseeable for 5 standard commercial operation, including any unavailability 6 caused by a buyer; storage capacity tests; system emergencies; 7 curtailments, including curtailment orders; transmission 8 system outages; compliance with any operating restriction; 9 serial defects; and planned outages. 10 "Facility owner" means (i) a person with a direct 11 ownership interest in an energy storage system, regardless of 12 whether the person is involved in acquiring the necessary 13 rights, permits, and approvals or otherwise planning for the 14 construction and operation of the facility and (ii) a person 15 who, at the time the facility is being developed, is acting as 16 a developer of the facility by acquiring the necessary rights, 17 permits, and approvals or by planning for the construction and 18 operation of the facility, regardless of whether the person 19 will own or operate the facility. 20 "Force majeure" means any event or circumstance that 21 delays or prevents an energy storage system from timely 22 performing all or a portion of its commercial operations if 23 the act or event, despite the exercise of commercially 24 reasonable efforts, cannot be avoided by and is beyond the 25 reasonable control, whether direct or indirect, of, and 26 without the fault or negligence of, a facility owner or HB5837 - 24 - LRB104 23685 TRT 40200 b 1 operator or any of its assignees. "Force majeure" includes, 2 but is not limited to: 3 (1) fire, flood, tornado, or other natural disasters 4 or acts of God; 5 (2) war, civil strife, terrorist attack, or other 6 similar acts of violence; 7 (3) unavailability of materials, equipment, services, 8 or labor, including unavailability due to global supply 9 chain shortages; 10 (4) utility or energy shortages or acts or omissions 11 of public utility providers; 12 (5) any delay resulting from a pandemic, epidemic, or 13 other public health emergency or related restrictions; and 14 (6) litigation or a regulatory proceeding regarding a 15 facility. 16 "NFPA" means the National Fire Protection Association. 17 "Nonparticipating property" means real property that is 18 not a participating property. 19 "Nonparticipating residence" means a residence that is 20 located on nonparticipating property and that exists and is 21 occupied on the date that the application for a permit to 22 develop an energy storage system is filed with the county. 23 "Occupied community building" means a school, place of 24 worship, early care and education facility, public library, or 25 community center that is occupied on the date that the 26 application for a permit to develop an energy storage system HB5837 - 25 - LRB104 23685 TRT 40200 b 1 is filed with the county in which the building is located. 2 "Participating property" means real property that is the 3 subject of a written agreement between a facility owner and 4 the owner of the real property and that provides the facility 5 owner an easement, option, lease, or license to use the real 6 property for the purpose of constructing an energy storage 7 system or supporting facilities. 8 "Protected lands" means real property that is: (i) subject 9 to a permanent conservation right consistent with the Real 10 Property Conservation Rights Act; or (ii) registered or 11 designated as a nature preserve, buffer, or land and water 12 reserve under the Illinois Natural Areas Preservation Act. 13 "Supporting facilities" means the transmission lines, 14 substations, switchyard, access roads, meteorological towers, 15 storage containers, and equipment associated with the 16 generation, storage, and dispatch of electricity by an energy 17 storage system. 18 (b) Notwithstanding any other provision of law, if a 19 county has formed a zoning commission and adopted formal 20 zoning under Section 5-12007, then a county may establish 21 standards for energy storage systems in areas of the county 22 that are not within the zoning jurisdiction of a municipality. 23 The standards may include all of the requirements specified in 24 this Section but may not include requirements for energy 25 storage systems that are more restrictive than specified in 26 this Section or requirements that are not specified in this HB5837 - 26 - LRB104 23685 TRT 40200 b 1 Section. 2 (c) A county may require the energy storage facility to 3 comply with the version of NFPA 855 "Standard for the 4 Installation of Stationary Energy Storage Systems" in effect 5 on the effective date of this amendatory Act or any successor 6 standard issued by the NFPA in effect on the date of siting or 7 special use permit approval. A county may not include 8 requirements for energy storage systems that are more 9 restrictive than NFPA 855 "Standard for the Installation of 10 Stationary Energy Storage Systems" unless required by this 11 Section. 12 (d) If a county has elected to establish standards under 13 subsection (b), then the zoning board of appeals for the 14 county shall hold at least one public hearing before the 15 county grants (i) siting approval or a special use permit for 16 an energy storage system or (ii) modification of an approved 17 siting or special use permit. The public hearing shall be 18 conducted in accordance with the Open Meetings Act and shall 19 conclude not more than 60 days after the filing of the 20 application for the facility. The county shall allow 21 interested parties to a special use permit an opportunity to 22 present evidence and to cross-examine witnesses at the 23 hearing, but the county may impose reasonable restrictions on 24 the public hearing, including reasonable time limitations on 25 the presentation of evidence and the cross-examination of 26 witnesses. The county shall also allow public comment at the HB5837 - 27 - LRB104 23685 TRT 40200 b 1 public hearing in accordance with the Open Meetings Act. The 2 county shall make its siting and permitting decisions not more 3 than 30 days after the conclusion of the public hearing. 4 Notice of the hearing shall be published in a newspaper of 5 general circulation in the county. 6 (e) A county with an existing zoning ordinance in conflict 7 with this Section shall amend that zoning ordinance to comply 8 with this Section within 120 days after the effective date of 9 this amendatory Act of the 104th General Assembly. 10 (f) Except as otherwise provided in subsection (f-5), a A 11 county shall require an energy storage system to be sited as 12 follows, with setback distances measured from the nearest edge 13 of the nearest battery or other electrochemical or 14 electromechanical enclosure: 15 Setback Description Setback Distance 16 Occupied Community 150 feet from the nearest 17 Buildings and point of the outside wall of 18 Nonparticipating Residences the occupied community building 19 or nonparticipating residence 20 Boundary Lines of 50 feet to the nearest point 21 Occupied Community on the property line of 22 Buildings and the occupied community building 23 Nonparticipating Residences or nonparticipating property HB5837 - 28 - LRB104 23685 TRT 40200 b 1 Public Road Rights-of-Way 50 feet from the nearest edge 2 of the right-of-way 3 (2) A county shall also require an energy storage 4 system to be sited so that the facility's perimeter is 5 enclosed by fencing having a height of at least 7 feet and 6 no more than 25 feet. 7 This Section does not exempt or excuse compliance with 8 electric facility clearances approved or required by the 9 National Electrical Code, the National Electrical Safety Code, 10 the Illinois Commerce Commission, the Federal Energy 11 Regulatory Commission, and their designees or successors. 12 (f-5) A county may require setback distances in excess of 13 those established under subsection (f) of this Section upon a 14 finding by the county board that the setback distances would 15 impair residential, commercial, agricultural, or industrial 16 development or negatively affect residential, commercial, 17 agricultural, or industrial property values. 18 (g) A county may not set a sound limitation for energy 19 storage systems that is more restrictive than the sound 20 limitations established by the Illinois Pollution Control 21 Board under 35 Ill. Adm. Code Parts 900, 901, and 910. After 22 commercial operation, a county may require the facility owner 23 to provide, not more than once, octave band sound pressure 24 level measurements from a reasonable number of sampled 25 locations at the perimeter of the energy storage system to HB5837 - 29 - LRB104 23685 TRT 40200 b 1 demonstrate compliance with this Section. 2 (h) The provisions set forth in subsection (f) may be 3 waived subject to the written consent of the owner of each 4 affected nonparticipating property or nonparticipating 5 residence. 6 (i) A county may not place any restriction on the 7 installation or use of an energy storage system unless it has 8 formed a zoning commission and adopted formal zoning under 9 Section 5-12007 and adopts an ordinance that complies with 10 this Section. A county may not establish siting standards for 11 supporting facilities that preclude development of an energy 12 storage system. 13 (j) A request for siting approval or a special use permit 14 for an energy storage system, or modification of an approved 15 siting approval or special use permit, shall be approved if 16 the request complies with the standards and conditions imposed 17 in this Code, the zoning ordinance adopted consistent with 18 this Section, and other State and federal statutes and 19 regulations. The siting approval or special use permit 20 approved by the county shall grant the facility owner a period 21 of at least 3 years after county approval to obtain a building 22 permit or commence construction of the energy storage system, 23 before the siting approval or special use permit may become 24 subject to revocation by the county. Facility owners may be 25 granted an extension on obtaining building permits or 26 commencing constructing upon a showing of good cause. A HB5837 - 30 - LRB104 23685 TRT 40200 b 1 facility owner's request for an extension may not be 2 unreasonably withheld, conditioned, or denied. 3 (j-5) A county may deny the siting approval, issuance of a 4 special use permit, or modification of an approved siting or 5 special use permit for an energy storage system if the county 6 board finds that: 7 (1) the energy storage system will be located adjacent 8 to a water treatment facility; 9 (2) the energy storage system will be located in a 10 Metropolitan Statistical Area as delineated by the U.S. 11 Office of Management and Budget; 12 (3) the energy storage system will limit housing 13 opportunities in the county; 14 (4) the energy storage system will damage existing 15 agricultural areas; or 16 (5) any roadway will be unable to handle the traffic 17 created by the energy storage system. 18 (k) (Blank). A county may not adopt zoning regulations 19 that disallow, permanently or temporarily, an energy storage 20 system from being developed or operated in any district zones 21 to allow agricultural or industrial uses. 22 (l) A facility owner shall file a farmland drainage plan 23 with the county and impacted drainage districts that outlines 24 how surface and subsurface drainage of farmland will be 25 restored during and following the construction or 26 deconstruction of the energy storage system. The plan shall be HB5837 - 31 - LRB104 23685 TRT 40200 b 1 created independently by the facility owner and shall include 2 the location of any potentially impacted drainage district 3 facilities to the extent the information is publicly available 4 from the county or the drainage district and plans to repair 5 any subsurface drainage affected during construction or 6 deconstruction using procedures outlined in the 7 decommissioning plan. All surface and subsurface damage shall 8 be repaired as soon as reasonably practicable. 9 (m) A facility owner shall compensate landowners for crop 10 losses or other agricultural damages resulting from damage to 11 a drainage system caused by the construction of an energy 12 storage system. The facility owner shall repair or pay for the 13 repair of all damage to the subsurface drainage system caused 14 by the construction of the energy storage system. The facility 15 owner shall repair or pay for the repair and restoration of 16 surface drainage caused by the construction or deconstruction 17 of the energy storage facility as soon as reasonably 18 practicable. 19 (n) County siting approval or special use permit 20 application fees for an energy storage system shall not exceed 21 the lesser of (i) $5,000 per each megawatt of nameplate 22 capacity of the energy storage system or (ii) $50,000. 23 (o) The county may require a facility owner to provide a 24 decommissioning plan to the county. The decommissioning plan 25 may include all requirements for decommissioning plans in NFPA 26 855 and may also require the facility owner to: HB5837 - 32 - LRB104 23685 TRT 40200 b 1 (1) state how the energy storage system will be 2 decommissioned, including removal to a depth of 3 feet of 3 all structures that have no ongoing purpose and all debris 4 and restoration of the soil and any vegetation to a 5 condition as close as reasonably practicable to the soil's 6 and vegetation's preconstruction condition within 18 7 months of the end of project life or facility abandonment; 8 (2) include provisions related to commercially 9 reasonable efforts to reuse or recycle of equipment and 10 components associated with the commercial offsite energy 11 storage system; 12 (3) include financial assurance in the form of a 13 reclamation or surety bond or other commercially available 14 financial assurance that is acceptable to the county, with 15 the county or participating property owner as beneficiary. 16 The amount of the financial assurance shall not be more 17 than the estimated cost of decommissioning the energy 18 facility, after deducting salvage value, as calculated by 19 a professional engineer licensed to practice engineering 20 in this State with expertise in preparing decommissioning 21 estimates, retained by the applicant. The financial 22 assurance shall be provided to the county incrementally as 23 follows: 24 (A) 25% before the start of full commercial 25 operation; 26 (B) 50% before the start of the 5th year of HB5837 - 33 - LRB104 23685 TRT 40200 b 1 commercial operation; and 2 (C) 100% by the start of the tenth year of 3 commercial operation; 4 (4) update the amount of the financial assurance not 5 more than every 5 years for the duration of commercial 6 operations. The amount shall be calculated by a 7 professional engineer licensed to practice engineering in 8 this State with expertise in decommissioning, hired by the 9 facility owner; and 10 (5) decommission the energy storage system, in 11 accordance with an approved decommissioning plan, within 12 18 months after abandonment. An energy storage system that 13 has not stored electrical energy for 12 consecutive months 14 or that fails, for a period of 6 consecutive months, to pay 15 a property owner who is party to a written agreement, 16 including, but not limited to, an easement, option, lease, 17 or license under the terms of which an energy storage 18 system is constructed on the property, amounts owed in 19 accordance with the written agreement shall be considered 20 abandoned, except when the inability to store energy is 21 the result of an event of force majeure or excused service 22 interruption. 23 (p) A county may not condition approval of an energy 24 storage system on a property value guarantee and may not 25 require a facility owner to pay into a neighboring property 26 devaluation escrow account. HB5837 - 34 - LRB104 23685 TRT 40200 b 1 (q) A county may require that a facility owner provide the 2 results and recommendations from consultation with the 3 Department of Natural Resources that are obtained through the 4 Ecological Compliance Assessment Tool (EcoCAT) or a comparable 5 successor tool. 6 (r) A county may require an energy storage system to 7 adhere to the recommendations provided by the Department of 8 Natural Resources in an Agency Action Report under 17 Ill. 9 Adm. Code 1075. 10 (s) A county may require a facility owner to: 11 (1) demonstrate avoidance of protected lands as 12 identified by the Department of Natural Resources and the 13 Illinois Nature Preserves Commission; or 14 (2) consider the recommendations of the Department of 15 Natural Resources for setbacks from protected lands, 16 including areas identified by the Illinois Nature 17 Preserves Commission. 18 (t) A county may require that a facility owner provide 19 evidence of consultation with the Illinois Histor
This bill affects Climate & Environment and Energy.
Create a free account and set your issue preferences to see your alignment.
Sign Up for free →No roll-call vote has been recorded for this bill yet.
Want to dig deeper?
Create a free account to see your alignment for every bill — then Pro unlocks full voting history and AI analysis.
Sign Up for freeThe governor or the President signs the bill, vetoes it, or lets it become law without a signature. A legislature can also override a veto and enact the bill anyway.
Not recorded. That means we hold nothing showing this step, not that it did not happen.
Stages, sponsors and executive actions are read from the legislature's own published record via LegiScan. We report what it says and never infer an action from a date alone.
Building Out Utility Infrastructure in Rural America Act