Full bill text
The complete text as filed. This is the legislature's own wording — not a summary.
SB3917 Enrolled LRB104 19364 BDA 32812 b 1 AN ACT concerning safety. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 Section 5. The Environmental Protection Act is amended by 5 changing Section 39 and by adding Section 39.16 as follows: 6 (415 ILCS 5/39) (from Ch. 111 1/2, par. 1039) 7 (Text of Section before amendment by P.A. 104-458 ) 8 Sec. 39. Issuance of permits; procedures. 9 (a) When the Board has by regulation required a permit for 10 the construction, installation, or operation of any type of 11 facility, equipment, vehicle, vessel, or aircraft, the 12 applicant shall apply to the Agency for such permit and it 13 shall be the duty of the Agency to issue such a permit upon 14 proof by the applicant that the facility, equipment, vehicle, 15 vessel, or aircraft will not cause a violation of this Act or 16 of regulations hereunder. The Agency shall adopt such 17 procedures as are necessary to carry out its duties under this 18 Section. In making its determinations on permit applications 19 under this Section the Agency may consider prior adjudications 20 of noncompliance with this Act by the applicant that involved 21 a release of a contaminant into the environment. In granting 22 permits, the Agency may impose reasonable conditions 23 specifically related to the applicant's past compliance SB3917 Enrolled - 2 - LRB104 19364 BDA 32812 b 1 history with this Act as necessary to correct, detect, or 2 prevent noncompliance. The Agency may impose such other 3 conditions as may be necessary to accomplish the purposes of 4 this Act, and as are not inconsistent with the regulations 5 promulgated by the Board hereunder. Except as otherwise 6 provided in this Act, a bond or other security shall not be 7 required as a condition for the issuance of a permit. If the 8 Agency denies any permit under this Section, the Agency shall 9 transmit to the applicant within the time limitations of this 10 Section specific, detailed statements as to the reasons the 11 permit application was denied. Such statements shall include, 12 but not be limited to, the following: 13 (i) the Sections of this Act which may be violated if 14 the permit were granted; 15 (ii) the provision of the regulations, promulgated 16 under this Act, which may be violated if the permit were 17 granted; 18 (iii) the specific type of information, if any, which 19 the Agency deems the applicant did not provide the Agency; 20 and 21 (iv) a statement of specific reasons why the Act and 22 the regulations might not be met if the permit were 23 granted. 24 If there is no final action by the Agency within 90 days 25 after the filing of the application for permit, the applicant 26 may deem the permit issued; except that this time period shall SB3917 Enrolled - 3 - LRB104 19364 BDA 32812 b 1 be extended to 180 days when (1) notice and opportunity for 2 public hearing are required by State or federal law or 3 regulation, (2) the application which was filed is for any 4 permit to develop a landfill subject to issuance pursuant to 5 this subsection, or (3) the application that was filed is for a 6 MSWLF unit required to issue public notice under subsection 7 (p) of Section 39. The 90-day and 180-day time periods for the 8 Agency to take final action do not apply to NPDES permit 9 applications under subsection (b) of this Section, to RCRA 10 permit applications under subsection (d) of this Section, to 11 UIC permit applications under subsection (e) of this Section, 12 or to CCR surface impoundment applications under subsection 13 (y) of this Section. 14 The Agency shall publish notice of all final permit 15 determinations for development permits for MSWLF units and for 16 significant permit modifications for lateral expansions for 17 existing MSWLF units one time in a newspaper of general 18 circulation in the county in which the unit is or is proposed 19 to be located. 20 After January 1, 1994 and until July 1, 1998, operating 21 permits issued under this Section by the Agency for sources of 22 air pollution permitted to emit less than 25 tons per year of 23 any combination of regulated air pollutants, as defined in 24 Section 39.5 of this Act, shall be required to be renewed only 25 upon written request by the Agency consistent with applicable 26 provisions of this Act and regulations promulgated hereunder. SB3917 Enrolled - 4 - LRB104 19364 BDA 32812 b 1 Such operating permits shall expire 180 days after the date of 2 such a request. The Board shall revise its regulations for the 3 existing State air pollution operating permit program 4 consistent with this provision by January 1, 1994. 5 After June 30, 1998, operating permits issued under this 6 Section by the Agency for sources of air pollution that are not 7 subject to Section 39.5 of this Act and are not required to 8 have a federally enforceable State operating permit shall be 9 required to be renewed only upon written request by the Agency 10 consistent with applicable provisions of this Act and its 11 rules. Such operating permits shall expire 180 days after the 12 date of such a request. Before July 1, 1998, the Board shall 13 revise its rules for the existing State air pollution 14 operating permit program consistent with this paragraph and 15 shall adopt rules that require a source to demonstrate that it 16 qualifies for a permit under this paragraph. 17 (b) The Agency may issue NPDES permits exclusively under 18 this subsection for the discharge of contaminants from point 19 sources into navigable waters, all as defined in the Federal 20 Water Pollution Control Act, as now or hereafter amended, 21 within the jurisdiction of the State, or into any well. 22 All NPDES permits shall contain those terms and 23 conditions, including, but not limited to, schedules of 24 compliance, which may be required to accomplish the purposes 25 and provisions of this Act. All NPDES Permits authorizing a 26 discharge from a facility designated by the Agency and the SB3917 Enrolled - 5 - LRB104 19364 BDA 32812 b 1 USEPA as a major facility shall require, at a minimum, for 2 publicly owned treatment works, as well as for privately owned 3 sewage treatment works, periodic sampling of influent, 4 effluent, and biosolids for all perfluoroalkyl and 5 polyfluoroalkyl substances for which there are accredited 6 wastewater analytical methods, and, for all other major 7 industrial facilities, periodic effluent sampling for all 8 perfluoroalkyl and polyfluoroalkyl substances for which there 9 are accredited wastewater analytical methods. If a permittee 10 demonstrates through monitoring data that perfluoroalkyl and 11 polyfluoroalkyl substances have not been detected above the 12 minimum level of quantification for a period of 2 consecutive 13 years, the permittee may request a modification of the NPDES 14 permit. If the Agency makes a determination that such a 15 request is acceptable, then the NPDES permit may be modified 16 to reduce sample frequency. 17 The Agency may issue general NPDES permits for discharges 18 from categories of point sources which are subject to the same 19 permit limitations and conditions. Such general permits may be 20 issued without individual applications and shall conform to 21 regulations promulgated under Section 402 of the Federal Water 22 Pollution Control Act, as now or hereafter amended. 23 The Agency may include, among such conditions, effluent 24 limitations and other requirements established under this Act, 25 Board regulations, the Federal Water Pollution Control Act, as 26 now or hereafter amended, and regulations pursuant thereto, SB3917 Enrolled - 6 - LRB104 19364 BDA 32812 b 1 and schedules for achieving compliance therewith at the 2 earliest reasonable date. 3 The Agency shall adopt filing requirements and procedures 4 which are necessary and appropriate for the issuance of NPDES 5 permits, and which are consistent with the Act or regulations 6 adopted by the Board, and with the Federal Water Pollution 7 Control Act, as now or hereafter amended, and regulations 8 pursuant thereto. The Agency shall require any NPDES permit 9 application for a discharge of wastewater that has potential 10 to contain perfluoroalkyl and polyfluoroalkyl substances to 11 fully characterize the discharge through sample results for 12 all perfluoroalkyl and polyfluoroalkyl substances for which 13 there are accredited wastewater analytical methods. 14 The Agency, subject to any conditions which may be 15 prescribed by Board regulations, may issue NPDES permits to 16 allow discharges beyond deadlines established by this Act or 17 by regulations of the Board without the requirement of a 18 variance, subject to the Federal Water Pollution Control Act, 19 as now or hereafter amended, and regulations pursuant thereto. 20 (c) Except for those facilities owned or operated by 21 sanitary districts organized under the Metropolitan Water 22 Reclamation District Act, no permit for the development or 23 construction of a new pollution control facility may be 24 granted by the Agency unless the applicant submits proof to 25 the Agency that the location of the facility has been approved 26 by the county board of the county if in an unincorporated area, SB3917 Enrolled - 7 - LRB104 19364 BDA 32812 b 1 or the governing body of the municipality when in an 2 incorporated area, in which the facility is to be located in 3 accordance with Section 39.2 of this Act. For purposes of this 4 subsection (c), and for purposes of Section 39.2 of this Act, 5 the appropriate county board or governing body of the 6 municipality shall be the county board of the county or the 7 governing body of the municipality in which the facility is to 8 be located as of the date when the application for siting 9 approval is filed. 10 In the event that siting approval granted pursuant to 11 Section 39.2 has been transferred to a subsequent owner or 12 operator, that subsequent owner or operator may apply to the 13 Agency for, and the Agency may grant, a development or 14 construction permit for the facility for which local siting 15 approval was granted. Upon application to the Agency for a 16 development or construction permit by that subsequent owner or 17 operator, the permit applicant shall cause written notice of 18 the permit application to be served upon the appropriate 19 county board or governing body of the municipality that 20 granted siting approval for that facility and upon any party 21 to the siting proceeding pursuant to which siting approval was 22 granted. In that event, the Agency shall conduct an evaluation 23 of the subsequent owner or operator's prior experience in 24 waste management operations in the manner conducted under 25 subsection (i) of Section 39 of this Act. 26 Beginning August 20, 1993, if the pollution control SB3917 Enrolled - 8 - LRB104 19364 BDA 32812 b 1 facility consists of a hazardous or solid waste disposal 2 facility for which the proposed site is located in an 3 unincorporated area of a county with a population of less than 4 100,000 and includes all or a portion of a parcel of land that 5 was, on April 1, 1993, adjacent to a municipality having a 6 population of less than 5,000, then the local siting review 7 required under this subsection (c) in conjunction with any 8 permit applied for after that date shall be performed by the 9 governing body of that adjacent municipality rather than the 10 county board of the county in which the proposed site is 11 located; and for the purposes of that local siting review, any 12 references in this Act to the county board shall be deemed to 13 mean the governing body of that adjacent municipality; 14 provided, however, that the provisions of this paragraph shall 15 not apply to any proposed site which was, on April 1, 1993, 16 owned in whole or in part by another municipality. 17 In the case of a pollution control facility for which a 18 development permit was issued before November 12, 1981, if an 19 operating permit has not been issued by the Agency prior to 20 August 31, 1989 for any portion of the facility, then the 21 Agency may not issue or renew any development permit nor issue 22 an original operating permit for any portion of such facility 23 unless the applicant has submitted proof to the Agency that 24 the location of the facility has been approved by the 25 appropriate county board or municipal governing body pursuant 26 to Section 39.2 of this Act. SB3917 Enrolled - 9 - LRB104 19364 BDA 32812 b 1 After January 1, 1994, if a solid waste disposal facility, 2 any portion for which an operating permit has been issued by 3 the Agency, has not accepted waste disposal for 5 or more 4 consecutive calendar years, before that facility may accept 5 any new or additional waste for disposal, the owner and 6 operator must obtain a new operating permit under this Act for 7 that facility unless the owner and operator have applied to 8 the Agency for a permit authorizing the temporary suspension 9 of waste acceptance. The Agency may not issue a new operation 10 permit under this Act for the facility unless the applicant 11 has submitted proof to the Agency that the location of the 12 facility has been approved or re-approved by the appropriate 13 county board or municipal governing body under Section 39.2 of 14 this Act after the facility ceased accepting waste. 15 Except for those facilities owned or operated by sanitary 16 districts organized under the Metropolitan Water Reclamation 17 District Act, and except for new pollution control facilities 18 governed by Section 39.2, and except for fossil fuel mining 19 facilities, the granting of a permit under this Act shall not 20 relieve the applicant from meeting and securing all necessary 21 zoning approvals from the unit of government having zoning 22 jurisdiction over the proposed facility. 23 Before beginning construction on any new sewage treatment 24 plant or sludge drying site to be owned or operated by a 25 sanitary district organized under the Metropolitan Water 26 Reclamation District Act for which a new permit (rather than SB3917 Enrolled - 10 - LRB104 19364 BDA 32812 b 1 the renewal or amendment of an existing permit) is required, 2 such sanitary district shall hold a public hearing within the 3 municipality within which the proposed facility is to be 4 located, or within the nearest community if the proposed 5 facility is to be located within an unincorporated area, at 6 which information concerning the proposed facility shall be 7 made available to the public, and members of the public shall 8 be given the opportunity to express their views concerning the 9 proposed facility. 10 The Agency may issue a permit for a municipal waste 11 transfer station without requiring approval pursuant to 12 Section 39.2 provided that the following demonstration is 13 made: 14 (1) the municipal waste transfer station was in 15 existence on or before January 1, 1979 and was in 16 continuous operation from January 1, 1979 to January 1, 17 1993; 18 (2) the operator submitted a permit application to the 19 Agency to develop and operate the municipal waste transfer 20 station during April of 1994; 21 (3) the operator can demonstrate that the county board 22 of the county, if the municipal waste transfer station is 23 in an unincorporated area, or the governing body of the 24 municipality, if the station is in an incorporated area, 25 does not object to resumption of the operation of the 26 station; and SB3917 Enrolled - 11 - LRB104 19364 BDA 32812 b 1 (4) the site has local zoning approval. 2 (d) The Agency may issue RCRA permits exclusively under 3 this subsection to persons owning or operating a facility for 4 the treatment, storage, or disposal of hazardous waste as 5 defined under this Act. Subsection (y) of this Section, rather 6 than this subsection (d), shall apply to permits issued for 7 CCR surface impoundments. 8 All RCRA permits shall contain those terms and conditions, 9 including, but not limited to, schedules of compliance, which 10 may be required to accomplish the purposes and provisions of 11 this Act. The Agency may include among such conditions 12 standards and other requirements established under this Act, 13 Board regulations, the Resource Conservation and Recovery Act 14 of 1976 (P.L. 94-580), as amended, and regulations pursuant 15 thereto, and may include schedules for achieving compliance 16 therewith as soon as possible. The Agency shall require that a 17 performance bond or other security be provided as a condition 18 for the issuance of a RCRA permit. 19 In the case of a permit to operate a hazardous waste or PCB 20 incinerator as defined in subsection (k) of Section 44, the 21 Agency shall require, as a condition of the permit, that the 22 operator of the facility perform such analyses of the waste to 23 be incinerated as may be necessary and appropriate to ensure 24 the safe operation of the incinerator. 25 The Agency shall adopt filing requirements and procedures 26 which are necessary and appropriate for the issuance of RCRA SB3917 Enrolled - 12 - LRB104 19364 BDA 32812 b 1 permits, and which are consistent with the Act or regulations 2 adopted by the Board, and with the Resource Conservation and 3 Recovery Act of 1976 (P.L. 94-580), as amended, and 4 regulations pursuant thereto. 5 The applicant shall make available to the public for 6 inspection all documents submitted by the applicant to the 7 Agency in furtherance of an application, with the exception of 8 trade secrets, at the office of the county board or governing 9 body of the municipality. Such documents may be copied upon 10 payment of the actual cost of reproduction during regular 11 business hours of the local office. The Agency shall issue a 12 written statement concurrent with its grant or denial of the 13 permit explaining the basis for its decision. 14 (e) The Agency may issue UIC permits exclusively under 15 this subsection to persons owning or operating a facility for 16 the underground injection of contaminants as defined under 17 this Act. 18 All UIC permits shall contain those terms and conditions, 19 including, but not limited to, schedules of compliance, which 20 may be required to accomplish the purposes and provisions of 21 this Act. The Agency may include among such conditions 22 standards and other requirements established under this Act, 23 Board regulations, the Safe Drinking Water Act (P.L. 93-523), 24 as amended, and regulations pursuant thereto, and may include 25 schedules for achieving compliance therewith. The Agency shall 26 require that a performance bond or other security be provided SB3917 Enrolled - 13 - LRB104 19364 BDA 32812 b 1 as a condition for the issuance of a UIC permit. 2 The Agency shall adopt filing requirements and procedures 3 which are necessary and appropriate for the issuance of UIC 4 permits, and which are consistent with the Act or regulations 5 adopted by the Board, and with the Safe Drinking Water Act 6 (P.L. 93-523), as amended, and regulations pursuant thereto. 7 The applicant shall make available to the public for 8 inspection all documents submitted by the applicant to the 9 Agency in furtherance of an application, with the exception of 10 trade secrets, at the office of the county board or governing 11 body of the municipality. Such documents may be copied upon 12 payment of the actual cost of reproduction during regular 13 business hours of the local office. The Agency shall issue a 14 written statement concurrent with its grant or denial of the 15 permit explaining the basis for its decision. 16 (f) In making any determination pursuant to Section 9.1 of 17 this Act: 18 (1) The Agency shall have authority to make the 19 determination of any question required to be determined by 20 the Clean Air Act, as now or hereafter amended, this Act, 21 or the regulations of the Board, including the 22 determination of the Lowest Achievable Emission Rate, 23 Maximum Achievable Control Technology, or Best Available 24 Control Technology, consistent with the Board's 25 regulations, if any. 26 (2) The Agency shall adopt requirements as necessary SB3917 Enrolled - 14 - LRB104 19364 BDA 32812 b 1 to implement public participation procedures, including, 2 but not limited to, public notice, comment, and an 3 opportunity for hearing, which must accompany the 4 processing of applications for PSD permits. The Agency 5 shall briefly describe and respond to all significant 6 comments on the draft permit raised during the public 7 comment period or during any hearing. The Agency may group 8 related comments together and provide one unified response 9 for each issue raised. 10 (3) Any complete permit application submitted to the 11 Agency under this subsection for a PSD permit shall be 12 granted or denied by the Agency not later than one year 13 after the filing of such completed application. 14 (4) The Agency shall, after conferring with the 15 applicant, give written notice to the applicant of its 16 proposed decision on the application, including the terms 17 and conditions of the permit to be issued and the facts, 18 conduct, or other basis upon which the Agency will rely to 19 support its proposed action. 20 (g) The Agency shall include as conditions upon all 21 permits issued for hazardous waste disposal sites such 22 restrictions upon the future use of such sites as are 23 reasonably necessary to protect public health and the 24 environment, including permanent prohibition of the use of 25 such sites for purposes which may create an unreasonable risk 26 of injury to human health or to the environment. After SB3917 Enrolled - 15 - LRB104 19364 BDA 32812 b 1 administrative and judicial challenges to such restrictions 2 have been exhausted, the Agency shall file such restrictions 3 of record in the Office of the Recorder of the county in which 4 the hazardous waste disposal site is located. 5 (h) A hazardous waste stream may not be deposited in a 6 permitted hazardous waste site unless specific authorization 7 is obtained from the Agency by the generator and disposal site 8 owner and operator for the deposit of that specific hazardous 9 waste stream. The Agency may grant specific authorization for 10 disposal of hazardous waste streams only after the generator 11 has reasonably demonstrated that, considering technological 12 feasibility and economic reasonableness, the hazardous waste 13 cannot be reasonably recycled for reuse, nor incinerated or 14 chemically, physically, or biologically treated so as to 15 neutralize the hazardous waste and render it nonhazardous. In 16 granting authorization under this Section, the Agency may 17 impose such conditions as may be necessary to accomplish the 18 purposes of the Act and are consistent with this Act and 19 regulations promulgated by the Board hereunder. If the Agency 20 refuses to grant authorization under this Section, the 21 applicant may appeal as if the Agency refused to grant a 22 permit, pursuant to the provisions of subsection (a) of 23 Section 40 of this Act. For purposes of this subsection (h), 24 the term "generator" has the meaning given in Section 3.205 of 25 this Act, unless: (1) the hazardous waste is treated, 26 incinerated, or partially recycled for reuse prior to SB3917 Enrolled - 16 - LRB104 19364 BDA 32812 b 1 disposal, in which case the last person who treats, 2 incinerates, or partially recycles the hazardous waste prior 3 to disposal is the generator; or (2) the hazardous waste is 4 from a response action, in which case the person performing 5 the response action is the generator. This subsection (h) does 6 not apply to any hazardous waste that is restricted from land 7 disposal under 35 Ill. Adm. Code 728. 8 (i) Before issuing any RCRA permit, any permit for a waste 9 storage site, sanitary landfill, waste disposal site, waste 10 transfer station, waste treatment facility, waste incinerator, 11 or any waste-transportation operation, any permit or interim 12 authorization for a clean construction or demolition debris 13 fill operation, or any permit required under subsection (d-5) 14 of Section 55, the Agency shall conduct an evaluation of the 15 prospective owner's or operator's prior experience in waste 16 management operations, clean construction or demolition debris 17 fill operations, and tire storage site management. The Agency 18 may deny such a permit, or deny or revoke interim 19 authorization, if the prospective owner or operator or any 20 employee or officer of the prospective owner or operator has a 21 history of: 22 (1) repeated violations of federal, State, or local 23 laws, regulations, standards, or ordinances in the 24 operation of waste management facilities or sites, clean 25 construction or demolition debris fill operation 26 facilities or sites, or tire storage sites; or SB3917 Enrolled - 17 - LRB104 19364 BDA 32812 b 1 (2) conviction in this or another State of any crime 2 which is a felony under the laws of this State, or 3 conviction of a felony in a federal court; or conviction 4 in this or another state or federal court of any of the 5 following crimes: forgery, official misconduct, bribery, 6 perjury, or knowingly submitting false information under 7 any environmental law, regulation, or permit term or 8 condition; or 9 (3) proof of gross carelessness or incompetence in 10 handling, storing, processing, transporting, or disposing 11 of waste, clean construction or demolition debris, or used 12 or waste tires, or proof of gross carelessness or 13 incompetence in using clean construction or demolition 14 debris as fill. 15 (i-5) Before issuing any permit or approving any interim 16 authorization for a clean construction or demolition debris 17 fill operation in which any ownership interest is transferred 18 between January 1, 2005, and the effective date of the 19 prohibition set forth in Section 22.52 of this Act, the Agency 20 shall conduct an evaluation of the operation if any previous 21 activities at the site or facility may have caused or allowed 22 contamination of the site. It shall be the responsibility of 23 the owner or operator seeking the permit or interim 24 authorization to provide to the Agency all of the information 25 necessary for the Agency to conduct its evaluation. The Agency 26 may deny a permit or interim authorization if previous SB3917 Enrolled - 18 - LRB104 19364 BDA 32812 b 1 activities at the site may have caused or allowed 2 contamination at the site, unless such contamination is 3 authorized under any permit issued by the Agency. 4 (j) The issuance under this Act of a permit to engage in 5 the surface mining of any resources other than fossil fuels 6 shall not relieve the permittee from its duty to comply with 7 any applicable local law regulating the commencement, 8 location, or operation of surface mining facilities. 9 (k) A development permit issued under subsection (a) of 10 Section 39 for any facility or site which is required to have a 11 permit under subsection (d) of Section 21 shall expire at the 12 end of 2 calendar years from the date upon which it was issued, 13 unless within that period the applicant has taken action to 14 develop the facility or the site. In the event that review of 15 the conditions of the development permit is sought pursuant to 16 Section 40 or 41, or permittee is prevented from commencing 17 development of the facility or site by any other litigation 18 beyond the permittee's control, such two-year period shall be 19 deemed to begin on the date upon which such review process or 20 litigation is concluded. 21 (l) No permit shall be issued by the Agency under this Act 22 for construction or operation of any facility or site located 23 within the boundaries of any setback zone established pursuant 24 to this Act, where such construction or operation is 25 prohibited. 26 (m) The Agency may issue permits to persons owning or SB3917 Enrolled - 19 - LRB104 19364 BDA 32812 b 1 operating a facility for composting landscape waste. In 2 granting such permits, the Agency may impose such conditions 3 as may be necessary to accomplish the purposes of this Act, and 4 as are not inconsistent with applicable regulations 5 promulgated by the Board. Except as otherwise provided in this 6 Act, a bond or other security shall not be required as a 7 condition for the issuance of a permit. If the Agency denies 8 any permit pursuant to this subsection, the Agency shall 9 transmit to the applicant within the time limitations of this 10 subsection specific, detailed statements as to the reasons the 11 permit application was denied. Such statements shall include 12 but not be limited to the following: 13 (1) the Sections of this Act that may be violated if 14 the permit were granted; 15 (2) the specific regulations promulgated pursuant to 16 this Act that may be violated if the permit were granted; 17 (3) the specific information, if any, the Agency deems 18 the applicant did not provide in its application to the 19 Agency; and 20 (4) a statement of specific reasons why the Act and 21 the regulations might be violated if the permit were 22 granted. 23 If no final action is taken by the Agency within 90 days 24 after the filing of the application for permit, the applicant 25 may deem the permit issued. Any applicant for a permit may 26 waive the 90-day limitation by filing a written statement with SB3917 Enrolled - 20 - LRB104 19364 BDA 32812 b 1 the Agency. 2 The Agency shall issue permits for such facilities upon 3 receipt of an application that includes a legal description of 4 the site, a topographic map of the site drawn to the scale of 5 200 feet to the inch or larger, a description of the operation, 6 including the area served, an estimate of the volume of 7 materials to be processed, and documentation that: 8 (1) the facility includes a setback of at least 200 9 feet from the nearest potable water supply well; 10 (2) the facility is located outside the boundary of 11 the 10-year floodplain or the site will be floodproofed; 12 (3) the facility is located so as to minimize 13 incompatibility with the character of the surrounding 14 area, including at least a 200 foot setback from any 15 residence, and in the case of a facility that is developed 16 or the permitted composting area of which is expanded 17 after November 17, 1991, the composting area is located at 18 least 1/8 mile from the nearest residence (other than a 19 residence located on the same property as the facility); 20 (4) the design of the facility will prevent any 21 compost material from being placed within 5 feet of the 22 water table, will adequately control runoff from the site, 23 and will collect and manage any leachate that is generated 24 on the site; 25 (5) the operation of the facility will include 26 appropriate dust and odor control measures, limitations on SB3917 Enrolled - 21 - LRB104 19364 BDA 32812 b 1 operating hours, appropriate noise control measures for 2 shredding, chipping and similar equipment, management 3 procedures for composting, containment and disposal of 4 non-compostable wastes, procedures to be used for 5 terminating operations at the site, and recordkeeping 6 sufficient to document the amount of materials received, 7 composted, and otherwise disposed of; and 8 (6) the operation will be conducted in accordance with 9 any applicable rules adopted by the Board. 10 The Agency shall issue renewable permits of not longer 11 than 10 years in duration for the composting of landscape 12 wastes, as defined in Section 3.155 of this Act, based on the 13 above requirements. 14 The operator of any facility permitted under this 15 subsection (m) must submit a written annual statement to the 16 Agency on or before April 1 of each year that includes an 17 estimate of the amount of material, in tons, received for 18 composting. 19 (n) The Agency shall issue permits jointly with the 20 Department of Transportation for the dredging or deposit of 21 material in Lake Michigan in accordance with Section 18 of the 22 Rivers, Lakes, and Streams Act. 23 (o) (Blank). 24 (p) (1) Any person submitting an application for a permit 25 for a new MSWLF unit or for a lateral expansion under 26 subsection (t) of Section 21 of this Act for an existing MSWLF SB3917 Enrolled - 22 - LRB104 19364 BDA 32812 b 1 unit that has not received and is not subject to local siting 2 approval under Section 39.2 of this Act shall publish notice 3 of the application in a newspaper of general circulation in 4 the county in which the MSWLF unit is or is proposed to be 5 located. The notice must be published at least 15 days before 6 submission of the permit application to the Agency. The notice 7 shall state the name and address of the applicant, the 8 location of the MSWLF unit or proposed MSWLF unit, the nature 9 and size of the MSWLF unit or proposed MSWLF unit, the nature 10 of the activity proposed, the probable life of the proposed 11 activity, the date the permit application will be submitted, 12 and a statement that persons may file written comments with 13 the Agency concerning the permit application within 30 days 14 after the filing of the permit application unless the time 15 period to submit comments is extended by the Agency. 16 When a permit applicant submits information to the Agency 17 to supplement a permit application being reviewed by the 18 Agency, the applicant shall not be required to reissue the 19 notice under this subsection. 20 (2) The Agency shall accept written comments concerning 21 the permit application that are postmarked no later than 30 22 days after the filing of the permit application, unless the 23 time period to accept comments is extended by the Agency. 24 (3) Each applicant for a permit described in part (1) of 25 this subsection shall file a copy of the permit application 26 with the county board or governing body of the municipality in SB3917 Enrolled - 23 - LRB104 19364 BDA 32812 b 1 which the MSWLF unit is or is proposed to be located at the 2 same time the application is submitted to the Agency. The 3 permit application filed with the county board or governing 4 body of the municipality shall include all documents submitted 5 to or to be submitted to the Agency, except trade secrets as 6 determined under Section 7.1 of this Act. The permit 7 application and other documents on file with the county board 8 or governing body of the municipality shall be made available 9 for public inspection during regular business hours at the 10 office of the county board or the governing body of the 11 municipality and may be copied upon payment of the actual cost 12 of reproduction. 13 (q) Within 6 months after July 12, 2011 (the effective 14 date of Public Act 97-95), the Agency, in consultation with 15 the regulated community, shall develop a web portal to be 16 posted on its website for the purpose of enhancing review and 17 promoting timely issuance of permits required by this Act. At 18 a minimum, the Agency shall make the following information 19 available on the web portal: 20 (1) Checklists and guidance relating to the completion 21 of permit applications, developed pursuant to subsection 22 (s) of this Section, which may include, but are not 23 limited to, existing instructions for completing the 24 applications and examples of complete applications. As the 25 Agency develops new checklists and develops guidance, it 26 shall supplement the web portal with those materials. SB3917 Enrolled - 24 - LRB104 19364 BDA 32812 b 1 (2) Within 2 years after July 12, 2011 (the effective 2 date of Public Act 97-95), permit application forms or 3 portions of permit applications that can be completed and 4 saved electronically, and submitted to the Agency 5 electronically with digital signatures. 6 (3) Within 2 years after July 12, 2011 (the effective 7 date of Public Act 97-95), an online tracking system where 8 an applicant may review the status of its pending 9 application, including the name and contact information of 10 the permit analyst assigned to the application. Until the 11 online tracking system has been developed, the Agency 12 shall post on its website semi-annual permitting 13 efficiency tracking reports that include statistics on the 14 timeframes for Agency action on the following types of 15 permits received after July 12, 2011 (the effective date 16 of Public Act 97-95): air construction permits, new NPDES 17 permits and associated water construction permits, and 18 modifications of major NPDES permits and associated water 19 construction permits. The reports must be posted by 20 February 1 and August 1 each year and shall include: 21 (A) the number of applications received for each 22 type of permit, the number of applications on which 23 the Agency has taken action, and the number of 24 applications still pending; and 25 (B) for those applications where the Agency has 26 not taken action in accordance with the timeframes set SB3917 Enrolled - 25 - LRB104 19364 BDA 32812 b 1 forth in this Act, the date the application was 2 received and the reasons for any delays, which may 3 include, but shall not be limited to, (i) the 4 application being inadequate or incomplete, (ii) 5 scientific or technical disagreements with the 6 applicant, USEPA, or other local, state, or federal 7 agencies involved in the permitting approval process, 8 (iii) public opposition to the permit, or (iv) Agency 9 staffing shortages. To the extent practicable, the 10 tracking report shall provide approximate dates when 11 cause for delay was identified by the Agency, when the 12 Agency informed the applicant of the problem leading 13 to the delay, and when the applicant remedied the 14 reason for the delay. 15 (r) Upon the request of the applicant, the Agency shall 16 notify the applicant of the permit analyst assigned to the 17 application upon its receipt. 18 (s) The Agency is authorized to prepare and distribute 19 guidance documents relating to its administration of this 20 Section and procedural rules implementing this Section. 21 Guidance documents prepared under this subsection shall not be 22 considered rules and shall not be subject to the Illinois 23 Administrative Procedure Act. Such guidance shall not be 24 binding on any party. 25 (t) Except as otherwise prohibited by federal law or 26 regulation, any person submitting an application for a permit SB3917 Enrolled - 26 - LRB104 19364 BDA 32812 b 1 may include with the application suggested permit language for 2 Agency consideration. The Agency is not obligated to use the 3 suggested language or any portion thereof in its permitting 4 decision. If requested by the permit applicant, the Agency 5 shall meet with the applicant to discuss the suggested 6 language. 7 (u) If requested by the permit applicant, the Agency shall 8 provide the permit applicant with a copy of the draft permit 9 prior to any public review period. 10 (v) If requested by the permit applicant, the Agency shall 11 provide the permit applicant with a copy of the final permit 12 prior to its issuance. 13 (w) An air pollution permit shall not be required due to 14 emissions of greenhouse gases, as specified by Section 9.15 of 15 this Act. 16 (x) If, before the expiration of a State operating permit 17 that is issued pursuant to subsection (a) of this Section and 18 contains federally enforceable conditions limiting the 19 potential to emit of the source to a level below the major 20 source threshold for that source so as to exclude the source 21 from the Clean Air Act Permit Program, the Agency receives a 22 complete application for the renewal of that permit, then all 23 of the terms and conditions of the permit shall remain in 24 effect until final administrative action has been taken on the 25 application for the renewal of the permit. 26 (y) The Agency may issue permits exclusively under this SB3917 Enrolled - 27 - LRB104 19364 BDA 32812 b 1 subsection to persons owning or operating a CCR surface 2 impoundment subject to Section 22.59. 3 (z) If a mass animal mortality event is declared by the 4 Department of Agriculture in accordance with the Animal 5 Mortality Act: 6 (1) the owner or operator responsible for the disposal 7 of dead animals is exempted from the following: 8 (i) obtaining a permit for the construction, 9 installation, or operation of any type of facility or 10 equipment issued in accordance with subsection (a) of 11 this Section; 12 (ii) obtaining a permit for open burning in 13 accordance with the rules adopted by the Board; and 14 (iii) registering the disposal of dead animals as 15 an eligible small source with the Agency in accordance 16 with Section 9.14 of this Act; 17 (2) as applicable, the owner or operator responsible 18 for the disposal of dead animals is required to obtain the 19 following permits: 20 (i) an NPDES permit in accordance with subsection 21 (b) of this Section; 22 (ii) a PSD permit or an NA NSR permit in accordance 23 with Section 9.1 of this Act; 24 (iii) a lifetime State operating permit or a 25 federally enforceable State operating permit, in 26 accordance with subsection (a) of this Section; or SB3917 Enrolled - 28 - LRB104 19364 BDA 32812 b 1 (iv) a CAAPP permit, in accordance with Section 2 39.5 of this Act. 3 All CCR surface impoundment permits shall contain those 4 terms and conditions, including, but not limited to, schedules 5 of compliance, which may be required to accomplish the 6 purposes and provisions of this Act, Board regulations, the 7 Illinois Groundwater Protection Act and regulations pursuant 8 thereto, and the Resource Conservation and Recovery Act and 9 regulations pursuant thereto, and may include schedules for 10 achieving compliance therewith as soon as possible. 11 The Board shall adopt filing requirements and procedures 12 that are necessary and appropriate for the issuance of CCR 13 surface impoundment permits and that are consistent with this 14 Act or regulations adopted by the Board, and with the RCRA, as 15 amended, and regulations pursuant thereto. 16 The applicant shall make available to the public for 17 inspection all documents submitted by the applicant to the 18 Agency in furtherance of an application, with the exception of 19 trade secrets, on its public internet website as well as at the 20 office of the county board or governing body of the 21 municipality where CCR from the CCR surface impoundment will 22 be permanently disposed. Such documents may be copied upon 23 payment of the actual cost of reproduction during regular 24 business hours of the local office. 25 The Agency shall issue a written statement concurrent with 26 its grant or denial of the permit explaining the basis for its SB3917 Enrolled - 29 - LRB104 19364 BDA 32812 b 1 decision. 2 (Source: P.A. 101-171, eff. 7-30-19; 102-216, eff. 1-1-22; 3 102-558, eff. 8-20-21; 102-813, eff. 5-13-22.) 4 (Text of Section after amendment by P.A. 104-458 ) 5 Sec. 39. Issuance of permits; procedures. 6 (a) When the Board has by regulation required a permit for 7 the construction, installation, or operation of any type of 8 facility, equipment, vehicle, vessel, or aircraft, the 9 applicant shall apply to the Agency for such permit and it 10 shall be the duty of the Agency to issue such a permit upon 11 proof by the applicant that the facility, equipment, vehicle, 12 vessel, or aircraft will not cause a violation of this Act or 13 of regulations hereunder. The Agency shall adopt such 14 procedures as are necessary to carry out its duties under this 15 Section. In making its determinations on permit applications 16 under this Section the Agency may consider prior adjudications 17 of noncompliance with this Act by the applicant that involved 18 a release of a contaminant into the environment. In granting 19 permits, the Agency may impose reasonable conditions 20 specifically related to the applicant's past compliance 21 history with this Act as necessary to correct, detect, or 22 prevent noncompliance. The Agency may impose such other 23 conditions as may be necessary to accomplish the purposes of 24 this Act, and as are not inconsistent with the regulations 25 promulgated by the Board hereunder. Except as otherwise SB3917 Enrolled - 30 - LRB104 19364 BDA 32812 b 1 provided in this Act, a bond or other security shall not be 2 required as a condition for the issuance of a permit. If the 3 Agency denies any permit under this Section, the Agency shall 4 transmit to the applicant within the time limitations of this 5 Section specific, detailed statements as to the reasons the 6 permit application was denied. Such statements shall include, 7 but not be limited to, the following: 8 (i) the Sections of this Act which may be violated if 9 the permit were granted; 10 (ii) the provision of the regulations, promulgated 11 under this Act, which may be violated if the permit were 12 granted; 13 (iii) the specific type of information, if any, which 14 the Agency deems the applicant did not provide the Agency; 15 and 16 (iv) a statement of specific reasons why the Act and 17 the regulations might not be met if the permit were 18 granted. 19 If there is no final action by the Agency within 90 days 20 after the filing of the application for permit, the applicant 21 may deem the permit issued; except that this time period shall 22 be extended to 180 days when (1) notice and opportunity for 23 public hearing are required by State or federal law or 24 regulation, (2) the application which was filed is for any 25 permit to develop a landfill subject to issuance pursuant to 26 this subsection, or (3) the application that was filed is for a SB3917 Enrolled - 31 - LRB104 19364 BDA 32812 b 1 MSWLF unit required to issue public notice under subsection 2 (p) of Section 39. The 90-day and 180-day time periods for the 3 Agency to take final action do not apply to NPDES permit 4 applications under subsection (b) of this Section, to RCRA 5 permit applications under subsection (d) of this Section, to 6 UIC permit applications under subsection (e) of this Section, 7 or to CCR surface impoundment applications under subsection 8 (y) of this Section. 9 The Agency shall publish notice of all final permit 10 determinations for development permits for MSWLF units and for 11 significant permit modifications for lateral expansions for 12 existing MSWLF units one time in a newspaper of general 13 circulation in the county in which the unit is or is proposed 14 to be located. 15 After January 1, 1994 and until July 1, 1998, operating 16 permits issued under this Section by the Agency for sources of 17 air pollution permitted to emit less than 25 tons per year of 18 any combination of regulated air pollutants, as defined in 19 Section 39.5 of this Act, shall be required to be renewed only 20 upon written request by the Agency consistent with applicable 21 provisions of this Act and regulations promulgated hereunder. 22 Such operating permits shall expire 180 days after the date of 23 such a request. The Board shall revise its regulations for the 24 existing State air pollution operating permit program 25 consistent with this provision by January 1, 1994. 26 After June 30, 1998, operating permits issued under this SB3917 Enrolled - 32 - LRB104 19364 BDA 32812 b 1 Section by the Agency for sources of air pollution that are not 2 subject to Section 39.5 of this Act and are not required to 3 have a federally enforceable State operating permit shall be 4 required to be renewed only upon written request by the Agency 5 consistent with applicable provisions of this Act and its 6 rules. Such operating permits shall expire 180 days after the 7 date of such a request. Before July 1, 1998, the Board shall 8 revise its rules for the existing State air pollution 9 operating permit program consistent with this paragraph and 10 shall adopt rules that require a source to demonstrate that it 11 qualifies for a permit under this paragraph. 12 Each air pollution construction permit for diesel powered 13 backup generators to a source that is a data center, as defined 14 in subsection (c) of Section 605-1025 of the Department of 15 Commerce and Economic Opportunity Law of the Civil 16 Administrative Code of Illinois, that is applied for 6 months 17 after the effective date of this amendatory Act of the 104th 18 General Assembly and that is required to have a federally 19 enforceable State operating permit or a Clean Air Act Permit 20 Program permit shall, in addition to any other applicable 21 requirements, require each backup generator to: (i) meet 22 standards at least as protective as Tier 4 standards for 23 non-road diesel engines set out by the United States 24 Environmental Protection Agency in 40 CFR 1039, as it exists 25 on the effective date of this amendatory Act of the 104th 26 General Assembly, and (ii) operate solely as an emergency or SB3917 Enrolled - 33 - LRB104 19364 BDA 32812 b 1 standby unit in accordance with 35 Ill. Adm. Code 211.1920, as 2 it exists on the effective date of this amendatory Act of the 3 104th General Assembly. If a diesel powered backup generator 4 becomes out of compliance with the Tier 4 standards for 5 non-road compression-ignition engines during a power outage, 6 the backup generator may (1) continue to operate for up to 24 7 sequential hours after becoming noncompliant with the Tier 4 8 standards or (2) operate when compliance is achieved. 9 Notwithstanding any provision of law to the contrary, 10 operation of the backup generator for up to 24 sequential 11 hours after becoming noncompliant with the Tier 4 standards 12 shall not be considered a violation of the permit. 13 Each air pollution construction permit for natural gas 14 powered backup generators for a source that is a data center, 15 as defined in subsection (c) of Section 605-1025 of the 16 Department of Commerce and Economic Opportunity Law of the 17 Civil Administrative Code of Illinois, that is applied for
Text is provided by LegiScan and may lag the latest filed version. Compare with the official version ↗